EEMCL completed the electrical and instrumentation works for the new products and LPG storage and distribution terminal in Tema, Ghana, for Metron Oil & Gas Limited, a subcontractor to China Petroleum Pipeline.
Work carried out
- Pulling and laying cables from the main chamber to the MCC
- Pulling cables out of the main chamber through corrugated pipes




